Azerbaijan’s ACE platform jacket loaded onto barge for shipment

Tokyo, 19 January, /AJMEDIA/

The jacket of the Azeri Central East (ACE) platform has been loaded onto the ‘STB-1’ barge of the Azerbaijan Caspian Shipping Company (ASCO), the company told AJMEDIA.

According to the company, the jacket built at the Heydar Aliyev Baku Deepwater Jackets Factory was loaded onto the barge for shipment to the sea.

“The weight of the jacket is 16,000 tons, and the height is 153 meters. This facility includes three vertical pipes – for water injection, oil export, and gas export,” ASCO noted.

The ACE project costing $6 billion includes a new offshore platform and other facilities designed to produce up to 100,000 barrels of oil per day. The ACE platform will maintain oil production at the Azeri-Chirag-Gunashli (ACG) block of fields above 400,000 barrels per day until the end of the 2020s.

Follow us on social

Facebook Twitter Youtube

Related Posts